PROCESS COMPONENTS INCLUDE:

  • Main Pump Station
  • Headworks Building - Mechanical bar screens, grit removal system
  • Aeration Basins - Four (4) aeration trains with fine bubble aeration system  
  • Final Clarifiers(4) – 100 Ft. Diameter  
  • Scum Removal System  
  • Chlorination Chamber 
  • Effluent Filter Building  
  • Effluent Pumping Station – Discharge ½ mile off shore
  • Two (2) Gravity Belt Thickeners
  • Sludge Storage Tanks – 1.025 Million Gallons total capacity
  • Sludge Dewatering Facility – Two (2) Belt Filter Press
  • Disinfection Building